Manufacturing Process
Wedo Mould has many years of experience in the mould industry and possesses rich manufacturing process knowledge. An excellent team, efficient management, experienced technicians, effective communication and advanced equipment can ensure our success. The following are key information for reference.
1. Work schedule: Machinists work around the clock. Usually, there are 7 assembly teams working in shifts every day, but sometimes night shifts are conducted when necessary.
2. The largest CNC lathe is 2100x1200x800mm.
3. The 150-ton mold closing machine is 1500x1100mm.
4. The crane can lift 10 tons.
5. The factory can produce 30 sets of medium-sized molds on average per month.
More in this section
-
Mold Design
Mold design and DFM analysis in NX and Moldflow: parting lines, gating, cooling and ejection are…
-
Quality Control
Mold quality control with CMM inspection, steel and hardness verification, dimensional reports and…
-
Trial Mold
Trial mold and T1 sampling: mold trial runs, dimensional and functional validation, sample reports…